Designing and drawings

Before starting production, we create a 3D model and develop technical drawings.
The customer can choose between:

  • A standard model from our selection (we make necessary adjustments to standard models).
  • A new model according to the customer’s sketches or drawings.

         
         To help the customer in communication with the municipality for building permits, we develop all drawings, foundation design sketches and 3D visualizations upon the municipality’s request.
         After the confirmation of drawings a contract is signed including all information necessary for the production and delivery of the house.

Production

Preparation of wood
A crucial factor for ensuring quality before the construction of a house is preparing the wood.

  • We use pine trees that grow in the East of Latvia (the rotation period of Latvian pine is 100 years).
  • Trees that are sawed in winter are used in production.
  • In order to get material for house construction, the timber is additionally dried in a computer-controlled drier for about 20-28 days. This reduces the moisture content of the wood to 18-22%.
  • For our customers in Norway, we offer wood that is compliant with the Norwegian house building standard “Bransjenorm for laftebygg dokument nr. KHL-002”.

         High quality materials for building houses can only be obtained by following all stages of wood preparation with care and integrity.

Production process 

Building wooden houses is a creative process – manual labor combined with modern technology.

  • The entire process of house building takes place indoors, under a roof. This ensures a steady moisture level applied to the wood.
  • The work process involves only professional carpenters that have been checked by the company.
  • The small amount of house production (8-12 houses per year) allows us to strictly follow the building technology.
  • House frame production (approx. 3-5 months).
  • The process involves constant quality control and communication with the customer.

Transportation and construction

Transportation
A transportation and assembly contract is signed with each customer from Latvia, the EU or Norway.

  • Delivery of the house frame to the customer’s building site may take 3-5 months.
  • The average assembly time in Norway is 6-7 weeks.
  • Materials are transported in collaboration with leading Baltic transportation and logistics companies. Transportation costs are included in the price.
  • The transportation of materials is always checked with the customer’s possibilities and availability.

Construction
In order to ensure a high quality and safety of work, we assemble the house at the building site ourselves. The team is trained and equipped with tools and machines that are needed for quick work.

  • Assembly of a log house frame takes 4-7 days.
  • A ready house, exterior only, takes 3-5 weeks (delivery, assembly, roof, windows, exterior doors, terrace).
  • A ready house, exterior and interior, takes 6-8 weeks (in addition to the aforementioned exterior works, we install interior doors, wooden floors, stairs, edging, sauna).
Procesi

Handing over and service

     Upon the completion of the entire building process, we issue detailed instructions for the house including recommendations for the correct use of the house.
        Based on Latvian legislation, we grant a 2-year warranty for key designs of the house.

        A year after handing the house over, we carry out an inspection of the house. We do repairs if needed and
provide tips on how to keep the wooden house in good condition for a long time.